Location
- Situated in Hoang Son, Hoang Phu, and Hoang Giang Communes.
- Adjacent to National Highway 1A, 70 km from Nghi Son deep-water seaport, about 40 km from Tho Xuan Airport and 145km from Hanoi capital.
Area
540 ha, with 129.25 ha of leasable industrial and service land.
Occupancy rate
0%
Nature and function
A multi-sector industrial park prioritising high-tech industry; processing and manufacturing, mechanical engineering and automotive industries; the pharmaceutical industry; the food industry; etc.
Technical infrastructure
- Power supply: Drawn from the newly built Hau Loc 220 kV substation, with a current capacity of 2x250 MVA, rising to 3x250 MVA by 2040.
- Water supply: Provided at a rate of 30 m³/hectare/day, with a current capacity of 13,000 m³/day (expandable to 55,000 m³/day) and an additional 21,000 m³/day from future water treatment plants in the industrial park, supported by a 10,000 m³ reservoir.
- Raw-water supply: Drawn from the southern canal; raw water is channelled into 2 raw-water reservoirs in the area before being fed into the treatment plant.
- Wastewater treatment: A wastewater treatment station with a capacity of 12,000 m³/day-night will be built, ensuring treatment of the entire wastewater volume.
- Solid waste treatment: The industrial park’s solid waste is collected and transported to a solid-waste treatment area.
- Telecommunications services: A fibre-optic broadband network covers the entire industrial park.
Investor
WHA Industrial Development 2 (SG) PTE. LTD; WHA Industrial Management Services Vietnam Company Limited; WHAUP Nghe An Joint Stock Company (Project implemented by: WHA Industrial Zone Thanh Hoa Joint Stock Company).
Construction investment status
Construction commenced on 14 October 2025 with a total investment of VND 1,320 billion and a scale of 178.51 ha.

Image

Video

Other industrial parks

INFORMATION TECHNOLOGY CENTER OF THANH HOA PROVINCE
Location: Hac Thanh WardArea: 7.35 ha. Nature and function: - Building the region's data storage center (Digital Hub).
- Mở chi nhánh, văn phòng hoạt động trong Tòa nhà Trung tâm CNTT nhằm tạo hệ sinh thái doanh nghiệp công nghệ số.
- Đầu tư Tòa nhà Trung tâm CNTT tỉnh Thanh Hóa trở thành cơ sở đào tạo nguồn nhân lực, chuyển giao công nghệ chất lượng cao và hình thành trung tâm hỗ trợ thiết kế chip của quốc gia.
TUONG LINH INDUSTRIAL PARK
Location: Located in Truong Van, Thang Binh, and Tuong Linh communes. Situated along the Sao Vang – Nghi Son route; approximately 185 km from Hanoi, 40 km from Tho Xuan Airport, 30 km from Nghi Son Deep-Sea Port, about 4 km from Minh Khoi Railway Station, and 4 km from the North–South Expressway interchange. Area: 344.05 ha.Nature and function: A modern, multi-sector industrial park uses high technology to manufacture and assemble electronic components, semiconductors, and telecommunication equipment.
WHA Smart Technology 2 Industrial Park – Thanh Hoa
Location: - Located in Thieu Quang commune
- 24 km from the center of Hac Thanh Ward, 84 km from Nghi Son deep-water seaport, adjacent to North-South Expressway interchange; about 38 km from Tho Xuan airport; 170 km from Hanoi capital.
Area: 175 ha, with 127.74 ha of leasable industrial and service land.Nature and function: A multi-sector industrial park prioritising high-tech industry; processing and manufacturing, mechanical engineering and automotive industries; the pharmaceutical industry; the food industry; etc.