Information
|
Detailed content
|
---|---|
Information
Location
|
Detailed content
- Located in Nghi Son Economic Zone.
- 5 km from National Highway 1A, 1km from North-South Expressway interchange, 14 km from Nghi Son deep-water seaport, 1 km from Truong Lam railway station, 65 km from Tho Xuan airport, 12 km from Nghi Son downtown, 60km from Thanh Hoa city, 200 km from Hanoi capital. |
Information
Area
|
Detailed content
691.45 ha, in which industrial land is 516.11ha and divided into two zones
+ Zone A: Thanh Hoa solar power plant No.1, with an area of 229.18ha + Zone B: Dong Vang Industrial park, area: 491.9 ha, in which industrial land is 321.63 ha |
Information
The occupancy rate
|
Detailed content
|
Information
Properties, functions
|
Detailed content
Fields calling for investment:
- Producing products from rubber and plastic. - Producing chemicals and chemical products. - Producing pharmaceutical drugs and pharmaceuticals. - Processing wood and producing products from wood, bamboo, and neohouzeaua (except beds, cabinets, tables, and chairs) from straw and braided materials. - Producing paper and paper products. - Textile and dyeing industry. - Producing leather and leather-related products. - Auxiliary industries. - Other industries by the law. |
Information
Technical infrastructure
|
Detailed content
- Power source: The power source for the project is taken from newly-invested 110kV in Nghi Son Economic Zone.
- Clean water: Clean water is taken from the Nghi Son water plant, with a capacity of 90,000 m3/day night, and the Hao Hao water plant, with a capacity of 125,000m3/day night . - Raw water: Raw water is taken from Yen My Lake, with a capacity of 87 million m3, and Muc Lake, with a capacity of 200 million m3, through a raw water pipeline system. - Wastewater treatment: has been invested. - Telecommunications services: Telecommunications services are advanced, broadband with high speed, capable of meeting high-quality telecommunications needs. |
Information
Capacity
|
Detailed content
|
Information
Total investment capital
|
Detailed content
|
Information
Investor
|
Detailed content
|
Information
Investment attraction situation
|
Detailed content
90 ha have been cleared, and 39.4ha have been leased and cleared. Within Dong Vang Industrial Park is a Duc Giang Nghi Son chemical complex No.1 project with an area of about 30 ha. Documents and procedures for construction are currently completed.
|
Implementation unit:
THANH HOA INVESTMENT, TRADE AND TOURISM PROMOTION AGENCY